Page 5 - 36 Section 5 – Maintenance Procedures CFP83 Series Every Year or 1000 Hours General Information All checks or inspections listed under daily or previous maintenance intervals must also be performed at this time, in addition to those listed under this maintenance interval, except for valve lash adjustment. Procedure 31 Check Overspeed Switch Operation Check the overspeed switch for operation. Refer to Operating Instructions in Section 3 of the Operational Manual for settings. Procedure 32 Check Drive Belt, Tensioner Bearing and Belt Tension Inspect Remove heat exchanger, piping and hoses. Remove the belt guard. Drawing No. 9777, Section 5, Rev. 02-07