Komatsu — 4.7.1.D CHECKING THE STEEL TRACK TENSION

MAINTENANCE PLAN 152 To increase the tension 1 - Loosen the screws and remove the cover (1) to reach the ad- justment point. Use a 17 mm hexagon spanner. 2 - Carefully clean the greasing valve (3) and inject grease through the greaser (2) until reaching the desired tension. 3 - When, owing to the injection of grease, the idler shoe reach- es the “S” measure, that is, 0 mm (0 in) and the track tension is not sufficient, this means that the pins and bushings are excessively worn. It is therefore necessary to turn or change the pins and bush- ings. For any change or repair, contact your Komatsu Dealer.

To reduce the tension 1 - After removing the cover that gives access to the adjustment point, gradually loosen the greasing valve (3) to let the grease out; do not give the valve more than one turn. Use a 19 mm hexagon spanner. 2 - If the grease does not flow out freely, move the machine slowly forward and backward for a short distance. 3 - Tighten the valve and remove any trace of grease. 4 - Move the machine forward and backward and, after stopping it, check the track tension again. 1 2 3 RWA06540 S RWA06550 1 2 3 RWA06540 IMPORTANT • The wear of pins and bushings varies according to the work conditions and the characteristics of the ground on which the machine operates.

Therefore, it is necessary to check the track tension fre- quently. • When working on rocky or extremely uneven ground, in- crease the track tension in order to prevent the introduc- tion of stones or rubble between the tracks and the sprocket; when working on soft or muddy ground, de- crease the track tension, since the soil penetrates be- tween rollers, sprocket and tracks and tends to increase it.