MAINTENANCE PLAN 4.7.2 MAINTENANCE INTERVALS IN CASE OF USE OF THE DEMOLITION HAMMER (BREAKER) The hydraulic oil used in the machines provided with demolition hammer deteriorates more quickly than the oil used in normal digging machines, therefore it is advisable to respect the following maintenance plan. 4.7.2.a CHANGING THE HYDRAULIC OIL FILTER In new machines, change the filter after the first 100-150 hours of operation and for the successive changes follow the instruc- tions given in the table on the right.
Replacement interval for hydraulic oil 2000 Replacement interval (H) 1500 4.7.2.b CHANGING THE HYDRAULIC OIL Change the hydraulic oil in the tank according to the instructions given in the table on the right. 1000 500 0 20 40 60 80 100 Breaker operating ratio (%) RWA07740 159 Replacement interval for element