MAINTENANCE PLAN 4.7.5 MAINTENANCE AFTER THE FIRST 250 HOURS OF OPERATION These maintenance operations must be carried out after the first 250 hours of operation, together with those to be carried out “EVERY 250 HOURS”. CHANGE THE OIL IN THE TRAVEL REDUCTION GEARS CHECK AND ADJUST THE ENGINE VALVE CLEARANCE For details on the various maintenance operations, see the sections “EVERY 1000 HOURS” and “EVERY 2000 HOURS”. For the inspection and adjustment, contact your Komatsu Dealer. 4.7.6 MAINTENANCE EVERY 250 HOURS OF OPERATION 4.7.6.a ADJUSTING THE FAN BELT TENSION RWA06200 2 166 The fan belt can be reached after opening the engine hood (See “3.5.1 ENGINE HOOD”). The control is manual:
press the belt (1) with your thumb on the indicated point with a force equal to approx. 60 N (13.5 lb); the resulting deflection must be approximately 10-15 mm (0.4 to 0.6 in). If the deflection exceeds this value, loosen the screws (1), (2) and (4) that fasten the alternator (3) and, with a lever inserted between the engine block and casing, make the alternator slide. Lock the screws and check again. Use a 12 mm and a 14 mm spanner. A -Fan pulley B -Driving shaft pulley A 10-15 mm IMPORTANT • If the belt is worn, change it and check the tension again after a few hours of operation. (0.4-0.6 in) B RWA32920