4) EPPR VALVE CHECK PROCEDURE Spec : 100~700 mA (1) Check electric current value at EPPR valve Adapter(P/no.:21Q6-50410) ① Disconnect connector CN-75 from EPPR valve. CN-75 ② Insert the adapter to CN-75 and install multimeter as figure. EPPR valve ③ Start engine. Multimeter ④ Set S-mode and cancel auto decel mode. ⑤ Position the multimodal dial at 10. Main pump ⑥ If rpm display show approx 1650 ± 50 rpm check electric current at bucket circuit relief position. 900L5MS21 ⑦ Check electric current at bucket circuit relief position. (2) Check pressure at EPPR valve Spec : 2~25 kgf/cm 2 (30~350 psi ) ① Remove plug and connect pressure gauge as figure. · Gauge capacity :
0 to 50 kgf/cm 2 Pressure adjusting screw locknut (0 to 725 psi ) ② Start engine. ③ Set S-mode and cancel auto decel mode. ④ Position the multimodal dial at 10. ⑤ If tachometer show approx 1650 ± 50 EPPR valve rpm check pressure at relief position of bucket circuit by operating bucket control lever. Pilot pressure supply line ⑥ If pressure is not correct, adjust it. 900L5MS22 ⑦ After adjust, test the machine. 5-77