Kaiyi — 4. MECHATRONICS SYSTEM

2. ENGINE STALL Before carrying out below procedure, check all the related connectors are properly inserted. 1) INSPECTION PROCEDURE Wiring diagram MCU FUSE EPPR POWER 24V 8 PUMP EPPR+ 9 No.6 PUMP EPPR- 10 PUMP EPPR VALVE GROUND(EPPR) 18 9 10 CN-52 CN-1 CN-75 900L6MS01 6-42 YES YES Check pressure at EPPR valve SPEC:2~25 kgf/cm2 See TEST 5 NO eck electric rent at EPPR ve YES C : 100~700 mA TEST 4 Check resistance between NO at EPPR valve SPEC : 15~25Ω(20˚C) See TEST 1 NO Cause Remedy Not enough engine power Defective EPPR valve Short circuit or poor connection between CN-52 - CN-75 Defective EPPR valve Check engine fault Contact scamia Replace Check and repair wire harness Replace 1 2