Kaiyi — 1. OPERATIONAL PERFORMANCE TEST

Unit : Seconds / 20 m 7-5 3) TRAVEL SPEED (1) Measure the time required for the excavator to travel a 20 m test track. (2) Preparation ① Adjust the tension of both tracks to be equal. ② Prepare a flat and solid test track 20m in length, with extra length of 3 to 5 m on both ends for machine acceleration and deceleration. ③ Hold the bucket 0.3 to 0.5 m above the ground with the arm and bucket rolled in. ④ Keep the hydraulic oil temperature at 50±5˚C. (3) Measurement ① Measure both the low and high speeds of the machine. ② Before starting either the low or high speed tests, adjust the travel mode switch to the speed to be tested, then select the following switch positions.

· Power mode switch : P mode ③ Start traveling the machine in the acceleration zone with the travel levers at full stroke. ④ Measure the time required to travel 20 m. ⑤ After measuring the forward travel speed, turn the upperstructure 180˚ and measure the reverse travel speed. ⑥ Repeat steps ④ and ⑤ three times in each direction and calculate the average values. (4) Evaluation 0.3~0.5m 480A7MS02 3~5m 20m 3~5m 480A7MS03 0.3~0.5m 480A7MS02 (4) The average measured time should meet t he following specifications. Model Travel speed Standard Maxi mum allowable R emarks HX900 L 1 Speed 29.5±2.0 37.3 2 Speed 20.5±1.0 26.0