Kaiyi — 1. OPERATIONAL PERFORMANCE TEST

Unit : Seconds / 3 revolutions 7-6 4) TRACK REVOLUTION SPEED (1) Measure the track revolution cycle time with the track raised off ground. (2) Preparation ① Adjust the tension of both side tracks to be equal. ② On the track to be measured, mark one shoe with chalk. ③ Swing the upperstructure 90˚ and lower the bucket to raise the track off ground. Keep the boom-arm angle between 90 to 110˚ as shown. Place blocks under machine frame. ④ Keep the hydraulic oil temperature at 50±5˚C. (3) Measurement ① Select the following switch positions. · Travel mode switch : 1 or 2 speed · Power mode switch : P mode · Auto idle switch :

OFF ② Operate the travel control lever of the raised track in full forward and reverse. ③ Rotate 1 turn, then measure time taken for next 3 revolutions. ④ Raise the other side of machine and repeat the procedure. ⑤ Repeat steps ③ and ④ three times and calculate the average values. (4) Evaluation 90~110 Mark 480L7MS04 90~110 Mark 480L7MS04 (4) E T he revolution cycle time of each track sho uld meet the following specifications. Model Travel speed Standard Maximum allowable HX900 L 1 Speed 59.0±2.0 72.5 2 Speed 41.0±1.0 49.9