Air Management Unit 42.19 Troubleshooting Test Test Perform the followings pressure regulator valve test to determine if the pressure valve module is function- ing correctly. If the test fails, replace the module. To test the inversion valve, a simple tester can be constructed consisting of a regulator valve, two valves, a pressure gauge, and some air line. See Fig. 1 . 1. Drain the air tanks. 2. Disconnect the delivery port on the face of the module and connect an accurate pressure gauge. B 2 3. Note the pressure setting of the regulator (see Table 14 ). 3 4 4. Connect an accurate pressure gauge to the sec- ondary air tank. A C 5. Start the engine. 1 6.
As pressure in the system is building, observe the pressure gauges. Until the pressure at the regulator valve equals its pressure setting, both gauges should read approximately the same. Once the pressure at the regulator reaches its setting it should remain at that pressure while the pressure in the secondary tank continues to rise to full pressure. Inversion Valve Module (Normally Open Relay) General Information 11/15/2001 f422278 A. Shop Air B. Exhaust to Atmosphere C. To Control Port 1. Valve "A" 2. Pressure Regulator 3. 0 to 150 psi gauge 4. Valve "B" Fig.
1, Setup for Inversion and Relay Valve Testing Perform the following test procedure to determine if the inversion valve module is functioning properly. If the module fails the test, replace it. 1. Drain the air tanks. 2. Disconnect the delivery port on the face of the module and connect an accurate pressure gauge. The inversion valve module is basically a normally open relay, meaning that when no pressure is ap- plied to the control port, supply air is delivered to the delivery port. When pressure is applied to the control port, the supply air is cut off from the delivery port and the delivery air is exhausted to atmosphere.
There are no internal supply, delivery, or control ports on this module. 3. Disconnect the control port on the face of the module and connect a regulated air supply setup as in Fig.1 to the control port. 4. Start the engine, build system air to full pressure. Shut the engine off. When rising pressure applied to the control port reaches 45 ±5 psi (310 ±34 kPa), the delivery port is cut off from the supply port, and delivery port air is exhausted to atmosphere. When applied pressure to the control port releases and reaches 25 ±5 psi (172 ±34 kPa), the delivery port is no longer exhausted to atmosphere and supply air is delivered to the deliv- ery port. 5.
Using the setup in Fig.1 , close Valve "A" and Valve "B". Back the regulator screw off so that the downstream pressure is zero. Connect shop air to the test apparatus. Open Valve "A". The gauge on the delivery port of the inversion mod- ule should read pressure. 6. Apply rising pressure to the control port by ad- justing the pressure regulator. While increasing the pressure, observe the pressure gauges. When the control port pressure (regulated) reaches approximately 30 to 45 psi (207 to 310 kPa), the delivery port (on inversion module) Business Class M2 Workshop Manual, Supplement 9, March 2006 300/12