Freightliner — Freightliner Business Class M2 Workshop Manual

Air Management Unit 42.19 Troubleshooting should exhaust (the delivery port gauge on the inversion valve module should drop to zero pres- sure). Relay Valve Module (normally closed) General Information 7. Once the delivery port on the inversion valve module has exhausted (pressure goes to zero), close Valve "A" on the test apparatus. Next, open Valve "B" slightly so as to relieve the control port pressure very slowly while observing the pres- sure gauges. When the control port pressure drops (pressure gauge on the test apparatus) to approximately 20 to 30 psi (138 to 207 kPa), the pressure at the delivery port of the inversion valve should read pressure.

Double Check Valve Module General Information The relay valve module delivers supply air to the de- livery port when the air is applied to the control port. When air pressure is released from the control port, the delivery port is exhausted to atmosphere. This module comes in two versions. In one version, there is an internal control port in addition to the one on the face of the module. In the other version, there is an internal delivery port in addition to the one on the face of the module. In both versions, there are no other internal ports.

When rising pressure applied to the control port reaches 21 ±3 psi (144 ±20 kPa), the delivery port is cut off from the exhaust to atmosphere and the sup- ply port delivers air to the delivery port. When ap- plied pressure to the control port releases and reaches 11 ±3 psi (76 ±20 kPa), the delivery port is cut off from the supply air, and delivery port air is exhausted to atmosphere. Test The double check valve module takes supply air from two sources and delivers the higher of the two to the delivery port. These modules do not have any inter- nal through ports to other modules.

Test Perform the following test procedure to determine if the double check valve module is functioning prop- erly. If the module fails the test, replace it. Perform the following test procedure to determine if the relay valve module is functioning properly. If the module fails the test, replace it. 1. Drain the air tanks. 2. Disconnect the delivery port on the face of the module and connect an accurate pressure gauge. 1. Drain the air tanks. 2. Disconnect the delivery port on the face of the module and connect an accurate pressure gauge. 3. Disconnect both supply ports. 4. Apply shop air to the upper supply port. The pressure gauge on the delivery port gauge should read shop air pressure.

Check for leak- age at the lower supply port, using a soapy wa- ter solution. There should be virtually no leakage (less than 3/8-inch bubble in 1 minute). 3. Disconnect the control port on the face of the module and connect a regulated air supply setup as in Fig.1 to the control port. 4. Start the engine, and build system air to full pressure. Shut the engine off. 5. Using the setup in Fig.1 , close Valve "A" and Valve "B". Back the regulator screw off so that the downstream pressure is zero. Connect shop air to the test apparatus. Open Valve "A". The gauge on the delivery port of the inversion mod- ule should read zero pressure. 5. Next, apply shop air to the lower supply port.

The pressure on the delivery port gauge should read shop air pressure. Check for leakage at the upper supply port, using a soapy water solution. There should be virtually no leakage (less than 3/8-inch bubble in 1 minute). 6. Apply rising pressure to the control port by ad- justing the pressure regulator. While increasing the pressure, observe the pressure gauges. When the control port pressure (regulated) reaches approximately 18 to 24 psi (124 to 165 Business Class M2 Workshop Manual, Supplement 9, March 2006 300/13