Freightliner — Freightliner Business Class M2 Workshop Manual

PowerFlow Fire Pump 90.01 Fire Pump Gearbox Removal, Disassembly, Assembly, and Installation 3 6 2 2 1 4 5 1 07/12/2001 f310033 1. Intermediate Shaft End Cap 2. Bearing 3. Spacer 4. Intermediate Shaft 5. Keyway 6. Intermediate Gear Fig. 10, Intermediate Shaft and Related Components 1 2 3 4 2 07/12/2001 f190034 07/12/2001 f190035 1 3 1. Gearbox 2. Shift Fork 3. Sliding Shift Gear 4. Shift Rod 1. Front Impeller Bearing 2. Slinger 3. Oil Seal Fig. 11, Sliding Gear Installation 12. Install the side cover on the gearbox with a new gasket and tighten the bolts to 22 lbf·ft (30 N·m). Fig. 12, Volute Housing (rear view) 13. Install the oil seal in the volute housing.

If the slinger was removed, install a new slinger. See Fig. 12 . 14. Carefully slide the volute housing over the impel- ler shaft. Align the slinger with the impeller shaft. Align the front impeller shaft bearing with the cavity in the rear of the volute housing and slide together. Install the attaching bolts with spacers and tighten the bolts to 70 lbf·ft (95 N·m). Business Class M2 Workshop Manual, Supplement 8, September 2005 100/6