Freightliner — Freightliner Business Class M2 Workshop Manual

PowerFlow Fire Pump 90.01 Fire Pump Gearbox Removal, Disassembly, Assembly, and Installation IMPORTANT: Extreme care MUST be taken when installing the volute housing on the impel- ler shaft to prevent damage to the oil seal. 15. Install the mechanical seal seat in the volute housing. See Subject 110 . 16. Install the impeller, clearance rings, suction head, and Y-adapter. See Subject 120 . 17. Install the gearbox cooler and connect the cool- ing lines. Installation 1. Apply Loctite ® 242 to the discharge manifold at- taching bolts (3/8–16 bolts). Tighten them to 40 lbf·ft (54 N·m). 2. Clean the intake Y-adapter and install a new seal.

The seal may be lubricated with petroleum jelly to ease installation.Install the intake Y-adapter. 3. Install the intake Y-adapter being careful not to damage the seal. Apply Loctite 242 to all studs and install the eight 3/8–24 nuts. Tighten them to 30 lbf·ft (41 N·m). 4. Connect the pump master drain. 5. Connect the electrical switches. 6. Connect the air lines to the shift cylinder. 7. Connect the driveshafts. Tighten the yoke fasten- ers to 225 lbf·ft (305 N·m). Tighten the bearing retaining strap capscrews to 40 to 48 lbf·ft (54 to 65 N·m). 8. Fill the gearbox with the necessary lubricant. 9. Fill the pump with water, test, and check for leaks. 10.

Remove the chocks from the front and rear tires. Business Class M2 Workshop Manual, Supplement 8, September 2005 100/7