John Deere 450DLC, 650DLC, and 850DLC Excavators — Fluid Analysis Program Test Kits and 3-Way Coolant Test Kit

Maintenance—Periodic Maintenance Maintenance and Repair Record Keeping System The checklist in this section summarizes scheduled maintenance, and parts and oil required at each maintenance interval. Use the checklist to: Remind you to perform machine maintenance at specified intervals to minimize downtime. Calculate cost of machine operation and ownership allowing you to make better job estimates. Place yourself in a stronger position at trade-in time. Satisfy your SECURE contract requirements. As maintenance is performed, check off each item on the list and record date and hour meter reading. Do not tear out or mark on checklist in this section; keep it to make extra copies.

T7511CO –UN–27JUN91 TX,50,FF2898 –19–28JUN06–1/1 Fluid Analysis Program Test Kits and 3-Way Coolant Test Kit Fluid Analysis Program Test Kits and the 3-Way Coolant Test Kit are John Deere fluid sampling products to help you monitor machine maintenance and system condition. The objective of a fluid sampling program is to ensure machine availability when you need it and to reduce repair costs by identifying potential problems before they become critical. TX1003513A –UN–20FEB06 Engine, hydraulic, power train, and coolant samples should be taken from each system on a periodic basis, usually prior to a filter and/or fluid change interval. Certain systems require more frequent sampling.

Consult your authorized John Deere dealer on a maintenance program for your specific application. Your authorized John Deere dealer has the sampling products and expertise to assist you in lowering your overall operating costs through fluid sampling. AM40430,00002FE –19–12DEC08–1/1 3-2-5 010609 PN=122