Maintenance—As Required Check and Adjust Track Sag 1. Swing upperstructure 90 ° , and lower bucket to raise track off ground. T121723 –UN–10JUN99 2. Keep the angle (1) between boom and arm 90—110 ° , and position the bucket’s round side on the ground. CAUTION: Prevent possible injury from unexpected machine movement. Place blocks under machine frame to support machine while measuring track sag. 1—Boom-To-Arm Angle 3. Place blocks under machine frame to support machine. 4. Rotate track forward two full rotations and then in reverse two full rotations. DW90712,0000042 –19–23OCT08–1/3 5. Measure distance (1) at middle track roller from bottom of track frame to top surface of track shoe.
450DLC—Specification Track—Sag 390—440 mm (15.3—17.3 in.) ................................................ 650DLC—Specification Track—Sag 450—500 mm (17.7—19.7 in.) ................................................ T137528 –UN–24JAN01 850DLC—Specification Track—Sag 460—510 mm (18.1—20.0 in.) ................................................ 1—Distance Continued on next page DW90712,0000042 –19–23OCT08–2/3 3-3-9 010609 PN=136