John Deere 450DLC, 650DLC, and 850DLC Excavators — Installation Sequence

Miscellaneous—Machine Assembly Avoid High-Pressure Fluids Escaping fluid under pressure can penetrate the skin causing serious injury. Avoid the hazard by relieving pressure before disconnecting hydraulic or other lines. Tighten all connections before applying pressure. X9811 –UN–08DEC08 Search for leaks with a piece of cardboard. Protect hands and body from high pressure fluids. If an accident occurs, see a doctor immediately. Any fluid injected into the skin must be surgically removed within a few hours or gangrene may result. Doctors unfamiliar with this type of injury should reference a knowledgeable medical source.

Such information is available from Deere & Company Medical Department in Moline, Illinois, U.S.A. DW90712,0000085 –19–23MAY06–1/1 Installation Sequence NOTE: Assembly is a 2-person, 2-day job, and disassembly requires 2 people for 1 day. These times may vary for inexperienced crews. 6. Connect arm cylinder rod. 7. Connect bucket cylinder hoses. 1. Install boom cylinder. 8. Adjust bucket linkage. 2. Install boom. 9. Extend side frame. 10. Check hydraulic oil level. 3. Connect hoses between boom and machine. 11. Lubricate working tool pivots. 4. Connect boom cylinder rod. 12. Install counterweight. 5. Install arm. DW90712,000007E –19–11MAY06–1/1 4-5-3 010609 PN=246