John Deere 450DLC, 650DLC, and 850DLC Excavators — Connecting Boom Cylinder Rod

Miscellaneous—Machine Assembly Connecting Boom Cylinder Rod 1. Lift right side boom cylinder (C) with a hoist. 2. Align the rod-pin bore of the boom cylinder with that of boom (B) by moving the boom cylinder up and down while extending or retracting cylinder rod (A). T122544 –UN–05AUG99 CAUTION: When aligning the centers of the pin and pin hole, Do Not put fingers into the pin hole. When using a hammer, wear safety equipment to protect against injury from flying pieces of metal. When inserting the pin, Do Not enter the area under the boom cylinder rod. 3. Install pin (D) into the pin bore, install pin retaining plate (E) cap screws (F). Tighten to 390 (288 lb-ft).

T122546 –UN–05AUG99 Specification Pin Retaining Plate Cap Screw— Torque 400 .......................................................................................... 290 lb-ft 4. Slide pin (D) to the right side (the side to which the cylinder rod has been installed) to allow the left side boom cylinder rod to be in the position ready for installation. T122547 –UN–05AUG99 5. Install the left side boom cylinder rod in the same procedure used in steps 2 and 3. 6. Install fittings and connect grease lines to rod ends of boom cylinders. A—Cylinder Rod B—Boom C—Cylinder D—Pin E—Pin Retaining Plate F—Cap Screw DW90712,0000078 –19–08FEB06–1/1 4-5-11 010609 PN=254