4-6-19 010609 PN=283 Miscellaneous—Operational Checkout Swing Park Brake and Circuit Drift Check Fill the bucket with dirt. Position machine on a side hill with a slope of approximately 25%. If a hill is not available, raise one side of machine approximately 300 mm (1 ft) with the boom and then put a block under the track. Move arm to the fully extended position. T140540 –UN–17MAY01 Raise boom so arm-to-bucket pivot pin are the same height as boom-to-frame pivot pin. Position upperstructure with cab over travel motors, perpendicular to tracks. Turn engine speed dial (1) to slow idle (L) position. Wait approximately 5 minutes with all functions in neutral. NOTE:
Function does not need to be fully actuated to disengage the swing park brake. Slowly actuate bucket load function to disengage the swing park brake. Do not hold the function over relief for more than 10 seconds. LOOK: Does upperstructure hold position when swing park brake is engaged? LOOK: Does upperstructure move only slightly when swing park brake is disengaged? Swing upperstructure 180 degrees counterclockwise and repeat procedure. Turn engine speed dial (1) to slow idle (L) position. Wait approximately 5 minutes with all functions in neutral. Slowly actuate bucket load function to disengage the swing park brake. Do not hold the function over relief for more than 10 seconds. LOOK:
Does upperstructure hold position when swing park brake is engaged? LOOK: Does upperstructure move only slightly when swing park brake is disengaged? YES: Go to next check. NO: See your authorized dealer. – – –1/1