John Deere 450DLC, 650DLC, and 850DLC Excavators — Operational Checks—Key Switch ON, Engine ON Checks

4-6-20 010609 PN=284 Miscellaneous—Operational Checkout Swing Power Check T140540 –UN–17MAY01 1—Engine Speed Dial 2—Auto-Idle Switch 3—Power Mode Switch Fill the bucket with dirt. Position machine on a hill side with a slope of approximately 25%. If a hill is not available, raise one side of machine approximately 300 mm (1 ft) with the boom and then put a block under the track. TX1000170 –UN–10NOV05 Move arm to the fully extended position. Raise boom so arm-to-bucket pivot pin are the same height as boom-to-frame pivot pin. Swing upperstructure clockwise so it’s 90 degrees to the slope Turn engine speed dial (1) to fast idle (H) position.

Turn power mode switch (3) to HP (high power) mode Actuate the swing function to swing up hill. LOOK: Does upperstructure swing up hill? Swing upperstructure 180 degrees counterclockwise and repeat procedure. Turn engine speed dial (1) to fast idle (H) position. Power mode switch (3) in HP (high power) mode Actuate the swing function to swing up hill. LOOK: Does upperstructure swing up hill? YES: Go to next check. NO: See your authorized dealer. – – –1/1