4-6-22 010609 PN=286 Miscellaneous—Operational Checkout Swing Priority Circuit Check CAUTION: Perform check in an open area away from other machinery or personnel. T6290AF –UN–19OCT88 1—Engine Speed Dial 2—Auto-Idle Switch 3—Power Mode Switch Position machine as shown. Turn engine speed dial (1) to fast idle (H) position. Turn power mode switch (3) to P (power) mode. TX1000170 –UN–10NOV05 Operate swing function and record time required for three complete revolutions. Divide that time by three to get an average time for one revolution. 450DLC—Specification Swing Function—Time— One Revolution.................................
6.17—7.17 seconds 650DLC—Specification Swing Function—Time— One Revolution..................................... 5.8—6.8 seconds 850DLC—Specification Swing Function—Time— One Revolution................................... 7.93—8.6 seconds IMPORTANT: Position machine as shown. Operate swing and arm in slowly a few times before attempting to perform check to ensure bucket does not contact machine or ground. Position machine as shown, arm extended, bucket curled and upper structure 90 degrees to tracks. Turn engine speed dial (1) to fast idle (H) position. Turn power mode switch (3) to P (power) mode.
Raise boom high enough so bucket does not contact the machine or ground during arm in and swing combined operation. Operate swing function and slowly actuate arm in function when upperstructure is in line with tracks. Record time required for one complete revolution. – – –1/2