John Deere 450DLC, 650DLC, and 850DLC Excavators — Counterweight Removal

Operation—Operating the Machine 29. Install top cover to counterweight and two bottom covers to machine mainframe. 30. Install counterweight lift cylinder lower guard. 31. Install lever cover over counterweight pilot valve. 32. Close left rear access door. DW90712,00001F0 –19–12SEP08–12/12 Counterweight Installation With Hydraulic Removal Option 1. Park machine on a level surface. 2. Lower bucket to ground. T8186AC –UN–07MAR94 3. Stop engine. 4. Remove both machine mainframe bottom access covers, counterweight lift cylinder lower guard, and counterweight top cover. MD04263,0000095 –19–09DEC08–1/7 5. Loosen jam nut and open shutoff valve (A). 6. Start engine. Run machine at slow idle. 7.

Leave pilot shutoff lever in locked (UP) position. CAUTION: To ensure good footing and visibility always stand on the machine service walk when operating counterweight pilot control valve. T8172AP –UN–20FEB94 8. Lower counterweight cylinder. A—Shutoff Valve B—Lift Cylinder Continued on next page MD04263,0000095 –19–09DEC08–2/7 2-3-22 010609 PN=92