Operation—Operating the Machine 9. Install counterweight lifting yoke link pins (2) to counterweight pin brackets. Slide yokes (4) forward to top position of slot in counterweight pin brackets. 1—Adjusting Nut (2 used) 2—Yoke-To-Counterweight Pin (2 used) 3—Slot 4—Yoke (2 used) 5—Counterweight TX1011165 –UN–16AUG06 Continued on next page MD04263,0000095 –19–09DEC08–3/7 2-3-23 010609 PN=93