Operation—Operating the Machine 14. Install washers on tie bolts (A). Install tie bolt through counterweight and frame. 15. Install spacers and nuts (B). One flat of nut must be against tab. Turn cap screws (A) into nuts until end of tie bolts are even with slotted end of nuts. A—Tie Bolt (2 used) B—Nut (2 used) C—Boss Plate D—Counterweight E—Shim (as required) F—Cap Screws (4 used) G—Lock Strap (2 used) T8172AD –UN–20FEB94 Continued on next page MD04263,0000095 –19–09DEC08–5/7 2-3-25 010609 PN=95