Removal and Installation 34. Remove cap screws (1) joining the two pumps and separate pumps. T118271B –UN–08JAN99 1—Cap Screw (4 used) CED,TX03399,5973 –19–24MAR00–10/15 35. Remove set screws (2) and dampener hub (3) from pump drive shaft. 03 0300 12 36. Remove four pump mounting cap screws and flywheel housing plate (1). 37. Install flywheel housing plate on pump. Tighten cap screws to specifications. T118491 –UN–11DEC98 Hydrostatic Pump—Specification Hydrostatic Pump-to-Flywheel Housing Plate—Torque 150 (115 lb-ft) ............................................... 38. Install dampener hub with tangs away from pump, and using a straightedge, install hub flush with edge of shaft.
1—Flywheel Housing Plate 2—Set Screws (3 used) 3—Dampener Hub 39. Clean set screws. Apply cure primer and thread lock and sealer (medium strength) to set screws. 40. Install set screws (2). Tighten set screws to specifications beginning with the screw closest to the pump, then working outward. Torque all set screws again, beginning with screw closest to pump. Hydrostatic Pump—Specification Dampener Hub-to-Hydrostatic Pump Shaft Set Screws—Torque 50 (37 lb-ft) ................................... Continued on next page CED,TX03399,5973 –19–24MAR00–11/15 TM1859 (14JUL04) 03-0300-12 700H Crawler Dozer 071404 PN=156