Removal and Installation 03 0300 14 T131503B –UN–12JUN00 1—Line (Front Pump Forward 5—Tee Fitting-to-Reservoir 11—Line (L.H. Motor Tee 17—Line (Front Pump Tee Outlet Port-to-R.H. Motor 6—Line (Rear Pump Forward Fitting-to-Oil Cooler Fitting-to-Cooler Bypass Forward Port) Outlet Port-to-L.H. Motor Bypass Valve) Valve) 2—Line (Front Charge Top Port) 12—Oil Cooler Bypass Valve 18—Rear Pump Pressure Pump-to-Rear Charge 7—Rear Pump Mount Wire Terminal Control Pilot PCP Pump Tee Fitting) Bracket-to-Frame Cap 13—Speed Sensor Wiring Connector 3—Line (Front Pump Reverse Screw (4 used) Connector 19—Reservoir Return Lines Outlet Port to R.H.
Motor 8—Hydraulic Pump Mounting 14—Tee Fitting (Front Pump) Bottom Port) Cap Screw (4 used) 15—Line (Park Brake) 4—Line (Rear Pump Reverse 9—Line Fitting (Rear Pump) 16—Front Pump Pressure Outlet Port-to-L.H. Motor 10—Line (Oil Cooler Bypass Control Pilot PCP Bottom Port) Valve-to-Reservoir) Connector 46. Install rear pump mount bracket cap screws (7) and tighten cap screws. 50. Connect wiring connectors (16, 13 and 18). 47. Install hydraulic pump. Tighten cap screws (8) to specifications. 51. Connect lines (10, 11, and 15). Remove by-pass valve cap screws and set control valve aside.
Hydrostatic Pump—Specification Hydraulic Pump Mounting Cap Screws—Torque 140 (103 lb-ft) ................................................... 52. Connect wire terminal (12). 53. Connect lines and remove fittings (14 and 9). 48. Connect return lines (19). 54. Connect line (17). 49. Connect lines (1—6) TM1859 (14JUL04) 03-0300-14 700H Crawler Dozer Continued on next page CED,TX03399,5973 –19–24MAR00–14/15 071404 PN=158