John Deere 700H Crawler Dozer — Remove and Install

Removal and Installation TM1859 (14JUL04) 03-0300-15 700H Crawler Dozer 071404 PN=159 55. Install bracket and cap screws (1). 56. Connect heater hose and water valve to bracket with tie bands. 57. Tighten all clamps. –UN–09JUN00 58. Install heater and connect heater hoses. 59. Install access plate on bottom of hydrostatic reservoir. T130901C 60. Fill hydrostatic reservoir. (See Operator’s Manual.) Hydrostatic Pump—Specification 1—Cap Screw (2 used) Hydrostatic Reservoir—Capacity.............. 65.1 L (17.2 gal) (Approximate) 61. Fill radiator with coolant (See Operator’s Manual.) Hydrostatic Pump—Specification Engine Coolant—Capacity........................ 19.4 L (20.5 qt) (Approximate) 62.

Turn battery disconnect switch to ON. 63. Perform hydrostatic pump start-up procedure. (See Hydrostatic Pump and Motor Initial Start-Up Procedure in Operation and Test Manual, Group 9026-25.) 64. Lower seat and secure floor plate. 65. Install tool box (if equipped), knee pads and armrests. 66. Install floor access plate and mat. 67. Calibrate transmission controller. (See Calibrate Transmission Controller in Operation and Test Manual, Group 9015-20). CED,TX03399,5973 –19–24MAR00–15/15 03 0300 15