John Deere 700H Crawler Dozer — Disassemble

Hydrostatic System IMPORTANT: Parts have critical, high tolerance surfaces which require careful handling to prevent damage. 54. Disassemble and inspect parts (A—E) discarding cap screws (F). A—Swashplate B—Piston Assembly (9 used) C—Slipper Guide D—Slipper Guide Bearing (2 used) E—Spacer (4 used) F—Cap Screw (4 used) T121170 –UN–17APR99 Continued on next page CED,OUTX547,110 –19–28JUN02–20/22 TM1859 (14JUL04) 03-0360-15 700H Crawler Dozer 071404 PN=205 IMPORTANT: Bearing cage wears patterns in bearing race and swashplate. Components must be installed in proper position with original orientation. 50. Tag or identify swashplate bearing cage positions to –UN–20JUN97 aid in proper assembly. 51.

Remove and inspect swashplate bearing cage (A). Replace as required. RW25741 52. Tag or identify bearing race positions to aid in proper assembly. A—Bearing Cage (2 used) 53. Remove and inspect the two bearing races (B). B—Bearing Race (2 used) Replace as required. CED,OUTX547,110 –19–28JUN02–19/22 03 0360 15