Hydrostatic System IMPORTANT: Servo arm alignment is critical. Do not remove servo arm (A) from swashplate unless replacing. 55. Remove feedback link (C) by removing socket head cap screw (D). RW25742 –UN–11JUN97 56. Inspect swashplate guide (B). 57. Remove cap screw (E) only if replacement of servo arm is needed. NOTE: Servo arm is a press fit. A—Servo Arm B—Swashplate Guide C—Feedback Link D—Socket Head Cap Screw E—Cap Screw 58. Install new servo arm carefully aligning the slot and threaded holes in swashplate. Arm must be pressed completely into swashplate slot. 03 0360 16 59. Install servo arm cap screw (E) and tighten to specifications.
Hydrostatic Pump—Specification Swashplate Servo Arm Cap Screw—Torque 32 (24 lb-ft) ................................................................ 60. Install feedback link (C) and swashplate guide (B). Tighten socket head cap screw (D) to specifications. Hydrostatic Pump—Specification Swashplate Feedback Link Cap Screw—Torque 32 (24 lb-ft) ................................................................ Continued on next page CED,OUTX547,110 –19–28JUN02–21/22 TM1859 (14JUL04) 03-0360-16 700H Crawler Dozer 071404 PN=206