Hydrostatic System TM1859 (14JUL04) 03-0360-53 700H Crawler Dozer 071404 PN=243 2. Install synchronizing shaft support pin (1) into the motor shaft assembly (5) and retain with petroleum jelly. IMPORTANT: The recess (3) on each roller MUST be positioned to face the center-line of the synchronizing shaft. 3. Install the synchronizing shaft rollers (2) on the journals of the synchronizing shaft and retain with petroleum jelly. Position each roller with its outside edge even with the end of the synchronizing shaft journal. 4. Install the second synchronizing shaft support pin (1) into the recess of the synchronizing shaft and retain with petroleum jelly. 5.
Install the synchronizing shaft and rollers into the motor shaft (5). The cylinder block end of the shaft is larger than the motor shaft end. 6. The rollers must enter the races in the motor shaft insert, and the recess in the end of the synchronizing shaft must engage the support pin. Tip and rotate the synchronizing shaft in all directions to check for binding. The synchronizing shaft rollers must move freely in the races in the motor shaft insert. 1—Support Pin 2—Rollers 3—Recess 4—Synchronizing Shaft 5—Motor Shaft Assembly –UN–10JUL95 T8506AH Continued on next page CED,TX03399,5995 –19–14JUL04–3/9 03 0360 53