Hydrostatic System 03 0360 54 T8506AI –UN–10JUL95 1—Motor Shaft 2—Synchronizing Shaft 3—Synchronizing Shaft Support Pin Rollers 7. Position the motor shaft (1) in the housing as shown. Tip the three pistons closest to the highest side of housing. the cylinder block, and the support pin enters its recess in the synchronizing shaft. NOTE: Apply clean hydrostatic oil to all cylinder block bores. 8. With the synchronizing shaft supported in the motor shaft, install the cylinder block and its synchronizing shaft support pin (2) onto the pistons and synchronizing shaft.
The cylinder block must be positioned so the synchronizing shaft rollers will enter their races in the block, while each piston enters its corresponding bore in the block. 10. Lift the cylinder block slightly and guide the three remaining pistons into their bores. After the last piston is in position, check the position of the rollers at highest side of housing. Maintain an inward force on the cylinder block and carefully push it toward the highest part of the housing to check that all synchronizing shaft rollers are in position. NOTE: A brass rod may be inserted through the cylinder block to guide the pistons into position. 9.
Start with the six pistons closest to the lower part of the end cap mounting surface. After the six pistons enter their bores, tilt the cylinder block so the synchronizing shaft rollers (3) enter their races in If cylinder block is properly assembled, there will be very little (if any) rotational free-play between the block and the motor shaft. TM1859 (14JUL04) 03-0360-54 700H Crawler Dozer Continued on next page CED,TX03399,5995 –19–14JUL04–4/9 071404 PN=244