Hydrostatic System TM1859 (14JUL04) 03-0360-55 700H Crawler Dozer 071404 PN=245 11. Install the bearing plate alignment pins (1) into cylinder block. The longer end of each shouldered pin is installed into block. 12. Install the bearing plate (2) on the cylinder block with the steel side facing toward the block. Lubricate the bronze side of the plate with clean hydrostatic oil. 13. Install end cap alignment pins (3) and gasket (4). Carefully locate the cylinder block against highest part of housing. IMPORTANT: DO NOT allow the pistons or synchronizing shaft rollers to fall out of position. 14. Apply petroleum jelly to mating surfaces of valve segment and end cap.
Install the valve segment (5) with hole (7) on opposite side of speed sensor, into the end cap (6) so the spindle engages the setting lug in the servo piston. Locate the valve segment and servo piston in the approximate center of its travel. 1—Alignment Pin (2 used) 2—Bearing Plate 3—Alignment Pin (2 used) 4—Gasket 5—Valve Segment 6—End Cap 7—Hole –UN–28OCT98 T118076 Continued on next page CED,TX03399,5995 –19–14JUL04–5/9 03 0360 55