Removal and Installation 23. Connect transmission and engine main wiring harness connectors (1 and 2) and wire connectors (3 and 5). 24. Connect ground strap (7) at right side of frame. 25. Install heater hose clamp (6). T130901B –UN–16MAY00 18 1800 26. Install tie bands on heater hose at bracket (4). 14 27. Install rear access cover. 28. Install floor plate and floor mat. 29. Install side shields and precleaner. 30. Install hood. (See Remove and Install Hood, Group 1910.) 31. Fill radiator with coolant. (See Operator’s Manual.) The approximate capacity of engine coolant is 19.4 L (20.5 qt). T130908B –UN–16MAY00 32. Fill hydraulic reservoir if drained.
(See Operator’s Manual.) The approximate capacity of hydraulic reservoir is 53.4 L (14.1 gal). Specification Hydraulic Reservoir—Capacity 53.4 L (14.1 gal) (Approximate) ................. 1—Transmission Main Wiring Harness Connector 2—Engine Main Wiring Harness Connector 3—Fuel Fired Heater Wire Connector (If equipped) 4—Bracket 5—Cab Heater Flow Control Valve Connector 6—Heater Hose Clamp 7—Ground Strap NOTE: If air conditioning system is being turned on for the first time, set engine rpm at slow idle to avoid possible high pressure discharge of extra refrigerant oil that is in all new compressors. 33. For Cabs Equipped With Air Conditioning System: Charge air conditioning system.
(See Charge R134a System in Group 1830.) Evacuate air conditioning system. (See Evacuate R134a System in Group 1830.) See Engine Speed Control Linkage Adjustment (S.N. —920838) or Engine Speed Control Linkage Adjustment (S.N. 920839— ). (Group 9010-20.) TM1859 (14JUL04) 18-1800-14 700H Crawler Dozer CED,TX03399,6047 –19–14APR03–11/11 071404 PN=412