Remove and Install Carrier Roller Track System CAUTION: Grease in track adjustment cylinder is under high pressure. Slowly loosen check valve nut to release grease from track tension adjuster. 01 0130 12 T131574B –UN–12JUN00 1. Slowly turn check valve nut about one turn to release track tension. (See Adjust Track Sag in this group.) 2. Raise and support track chain using a chain and hoist. CAUTION: The approximate weight of carrier roller with bracket is 52 kg (114 lb).
1—Carrier Roller Bracket Cap Screw-to-Cross Bar Support (4 used) 2—Bracket Cap Screws-to-Carrier Roller (2 used) Carrier Roller—Specification Carrier Roller with Bracket— Weight 52 kg (114 lb) ................................................................................... 3. Loosen cap screws (1) to remove carrier roller with bracket or loosen cap screws (2) on bracket and just remove carrier roller. 4. Install carrier roller and bracket. Tighten cap screws. CED,TX03399,5937 –19–24MAR00–1/1 TM1859 (14JUL04) 01-0130-12 700H Crawler Dozer 071404 PN=62