John Deere 700H Crawler Dozer — Remove and Install

Measure Track Pitch Track System NOTE: Track pitch does not extend unless there is lubrication leakage, which causes a dry joint. Measure pitch only when there is a lubrication leakage or a visible extension of a joint. 01 0130 32 T96311 –UN–02NOV88 A—Measurement Item Measurement Specification Track Pitch Pitch Wear Limit (Single Joint) Length 175.5 mm (6.9 in.) Track pin may be operated with a dry joint until it reaches wear limit specified. Then it must be repaired. A dry joint will not hold lubrication until it is repaired. Track pin may break if joint is not repaired after it reaches wear limit. 1. Place a pin or block between sprocket and chain.

Then move unit in reverse until chain is tight. 2. Measure from left side of pin in dry joint (A) to left side of next pin. CED,TX03399,5950 –19–24MAR00–1/1 Remove and Install Lubricated Track Chain— Saw Tooth Master Split Link 1. Rotate track until split link is at the top of front idler. 2. Block track at front idler. T8055BG –UN–29JUL93 3. Put a block on top of track tension adjuster, near front idler to keep chain supported. TM1859 (14JUL04) 01-0130-32 700H Crawler Dozer Continued on next page CED,TX03399,5951 –19–10NOV00–1/4 071404 PN=82