Track System IMPORTANT: Track chain MUST be installed under track frame with wide end of links (A) toward rear of machine or accelerated wear to track chain will occur. 01 0130 34 6. To join master link, locate master link pin end at the top of the front idler. Put a block at the front of the idler. T118611 –UN–23NOV98 7. Apply John Deere NEVER-SEEZ Lubricant to mating surfaces of master link. 8. Use a come-along device to bring master link halves together. Drive Sprocket End Shown A—Wide end of Link 9. Using new cap screws apply John Deere NEVER-SEEZ Lubricant to cap screw threads. 10. Install track shoe and new cap screws.
(See Remove and Install Track Shoe in this group.) Start cap screws by hand to avoid cross-threading. NEVER-SEEZ is a registered trademark of Emhart Chemical Group. CED,TX03399,5951 –19–10NOV00–3/4 IMPORTANT: Tighten cap screws to the initial torque using a criss-cross pattern. Repeat pattern for a second time. Finally, turn each cap screw the additional turn using the same pattern. T6352AH –UN–23FEB89 Item Measurement Specification Lubricated Track Split Link Cap Screw (5/8 in.) Torque 163 (120 lb-ft) Second Pass— Additional 1/2 (180 ° ) turn TM1859 (14JUL04) 01-0130-34 700H Crawler Dozer CED,TX03399,5951 –19–10NOV00–4/4 071404 PN=84