John Deere 700H Crawler Dozer — Assemble to Turn Bushings and Lubricate Chain

Track System 23. Add oil (SAE 80W 90) using a Seal Tester and Lubricator for S.A.L.T. Crawler Equipment. Push nozzle through plug all the way into pin. Depress control lever on the handle enough to draw specified vacuum as indicated on the gauge. 01 0130 44 T96287 –UN–01NOV88 Specification Lubricated Track Chain Seal Test—Vacuum 68—102 kPa (2—30 in. Hg) ............................................... 24. Release lever. If there is no decrease in vacuum for a minimum of five seconds, the joints are sealed. If there is a vacuum decrease, seals are not sealing and the joint must be taken apart and repaired. 25. Add oil by depressing the second lever.

Oil pressure (read on the same gauge) must be to specification after both levers are released. T6465AY –UN–01NOV88 Specification Lubricated Track Chain Oil— Pressure 140—205 kPa (1.4—2.05 bar (20—30 psi) ...................................................... 26. For pins using rubber plug and plastic plug, immediately install plug using JDG190 Plug Installer after adding oil. For pins using self-sealing plug, slowly pull nozzle (C) out to allow any compressed air to escape through nozzle from first hole (A) to second hole (B). Add oil to each joint after assembling so only one joint would have to be disassembled if a vacuum leak occurs. T96288 –UN–27OCT88 27.

Repeat step 10—26 for all joints. 28. Install assembled split links on ram plungers, and advance rams to press split links together. A—Nozzle First Hole B—Nozzle Second Hole C—Nozzle 29. Install lubricated track. chain. (See Remove and Install Lubricated Track Chain in this group.) 30. Install track shoes. (See Remove and Install Track Shoes in this group.) TM1859 (14JUL04) 01-0130-44 700H Crawler Dozer CED,TX03399,5953 –19–24MAR00–14/14 071404 PN=94