Perkins — Perkins 1204F-E44TA and 1204F-E44TTA Industrial Engine Systems Operation Manual

UENR4490-01 115 Basic Engine Inspect the Clearance of the Piston Ring Inspect the Piston Ring End Gap 1. Remove the piston rings and clean the grooves and the piston rings. Illustration 109 g00782363 (1) Piston ring (2) Cylinder ring ridge (3) Feeler gauge 1. Clean all carbon from the top of the cylinder bores. 2. Place each piston ring (1) in the cylinder bore just below the cylinder ring ridge (2). 3. Use a suitable feeler gauge (3) to measure piston ring end gap. Refer to Specifications, “Piston and Rings” for the dimensions. Illustration 108 g00905732 (1) Feeler gauge (2) Piston ring (3) Piston grooves Note:

The coil spring must be removed from the oil control ring before the gap of the oil control ring is measured. 2. Install new piston rings (2) in the piston grooves 3. Check the clearance for the piston ring by placing a suitable feeler gauge (1) between piston groove (3) and the top of piston ring (2) for the intermediate ring and the oil control ring. Refer to Specifications, “Piston and Rings” for the dimensions. (3). i04556601 Connecting Rod - Inspect Note: If the crankshaft or the cylinder block are replaced, the piston height for all cylinders must be measured. New piston pin bearings must be bored after installation in the original connecting rods. Refer to Note:

When the piston pin is installed, always install new retaining rings on each end of the piston pin. If the piston pin cannot be removed by hand, heat the piston to a temperature of 45° ± 5 °C (113° ± 9 °F) in order to aid the removal of the piston pin. Heating the piston to this temperature may also aid the installation of the piston pin. Piston Pin Bearings Note: This procedure requires personnel with the correct training and the use of specialized equipment for machining.