13 13-29 ervice standards Location Maintenance item Standard value Limit Remedy 5 Injection pressure 17.7 MPa (180 kg/cm2) [2,567 psi] – Adjust Tightening torques Unit: N·m (kgf·m) [lbf·ft] Location Parts to be tightened Tightening torque Remarks 1 Eyebolt (fuel leak-off pipe mounting) 9.8 to 15 (1.0 to 1.5) [7.23 to 11.1] – 3 Injection pipe union nut 25 (2.5) [18.4] – 4 Bolt (injection nozzle mounting) 15 (1.5) [11.1] – 6 Connector 69 to 78 (7 to 8) [50.9 to 57.5] – 7 Cap nut 29 to 39 (3 to 4) [21.4 to 28.8] – 11 Retaining nut 59 to 78 (6 to 8) [43.3 to 57.5] – Special tools Location Tool name and shape Part No. Application – Nozzle Cleaning Tool *105789-0010 Cleaning nozzles :
Zexel part number N Service procedure G Pre-disassembly inspection Fit the injection nozzle assembly 5 onto the nozzle tester A ready for inspection. NOTE Before commencing inspection, operate the lever on the nozzle tester A two or three times to bleed all air out of the arrangement. (1) Checking valve opening pressure • Push down the lever on the nozzle tester A at a rate of 1-2 seconds per stroke. The pressure gauge reading will gradually rise, then the needle will suddenly deflect. Note the pressure when the needle starts to deflect. • If the measurement is out of specification, disassemble the nozzle, clean it, and make adjustments using the adjusting screw 8.
• If the measurement is still out of specification after adjustment, 01910 replace the injection nozzle assembly 5. WARNING Do not touch the spray that comes out of the nozzle.