PIPER COMANCHE SERVICE MANUAL roller or blunt instrument. roll or pre the patch to tile c:alllellted aNa ad roll or press it down a half·inch to an inch aero at tiIIIe so not to trap air betWMD patch ud cell. L.ay S~ pound shot bae aver pcch which ia proteetlld by a piKe of Hol1ad Clotb to preyeat sUcking. Weipt should. not be teIIlaved far 6 hours. 7. Seal coat eel. of patch 1/2 iftch with cae coat of U.S. Rubber Co. 3230 or Minne.ota )Unin, Co. EC-678 cement aDd aUow the cement to dry tharouply. b. IIlside rS Cell. 1. After the dau,ed aNa baa been patched OIl the eutaWe of the cell aDd the repair al- lowed to stand a mwmWII of 6 bOlln. the cell ~ thea ready to have th.
patch applied OIl the insid.e of tbe cell. 2. Liptly &Del tharClUply buff piKe al cuNd U.S. Rubber Co. 5200/87 nyloa sandwich material 1 enoup to cover d ...... at le t 2 iDCb .. frma cur: i.a aay clirectioa. W.sh buffinl dust off patch with Methyl Ethyl Ketone soluUco (U.S. Rubber Co. 3339). 3. CelDent buffed side of pech with two Cotts 01. bl-ek rubber cement. U.S. Rubber Co. 3230 or Minnesota Miami Co. EC-678 d aUow eada coat to dry 10 to 15 miautH. 4. Buff cell .. a to be patched liptly aad tborouPlY with fiDe .. ery cloth ud then wash off buffinl dust with Methyl Ethyl Ketone so1l1tioa (U.s. Rubber Co. 3339). 5. C08t buffed area with two ca.ts of black rubber cement, U.S. Rubber Co.
3230 or Minne- sota MiAmi Co. EC-6i8. ami aUow each cott to dry 10 to 15 lDillllt 6. Freshen cemented ... of pacb .d c:alllented ... of with Methyl Ethyl Ketone solution (U.S. Rubber Co. 3339). i. While It ill tacky, apply eel. of patch to ed. of ceraeated .... ceateriDl patch over cut in cell. With a roUer or blunt iDstrWllellt, rollar press th. patch to the cemented area Oft the cell. Hold part of patch off the cemented ... and roU or pre .. it down a half-inch to an inch at a time so u not to trap air between patcb &Ad ceU. Apply SOopouad ,bot b.C to repaired ... and do not disturb for 6 hours. 8. Seal coat patch and 1/2 inch &011I cle of patch with two co.ts of U.S. Rubber Co.
3230 or Minnesota ~inl Co. EC-678 cemnt. Allow the fint e .. t to dry 15 minute. or more and the second coat to dry 12 houn ar more so that Wbell the ceU i. ia itl folded or oripnal position the patch area will not stick to other are .. of the cell. Wipe patch and cemented .rea liptly with number 10 oil. c. Scuffed Fabric. 1. Buff a surtoWldiDlscuffed fabric. 2. Wash buffin. dust &OID .. a with 3339 sollltioa. 3. Apply two coats ci U.S. Rubber Co. 3230 or Mimlesota Mia.inl Co. EC·6i8 cement to the buffed area, allowia& 10 millute. dryiDl time between coats. 8-12. fuel Selector Val" 8-13. R.lftcwal Of Fuel Selector ValYe., Remoye!
of the fuel valye on all models of Camanche aircrait are basicaUy the same. a. Drain fuel from the fuel cells. b. Remoye the fuel ,.lector v.lve handle. c. Remove the screw, Mcurinl the 'fuel valve protector plate and remove plate. If plate is wired with se lector switches. brinl the plate Itrapt up. beinl careful not to damale the switches FUEL SYSTEM ISSUED: 8/'8/72 2 J2