TESTING AND ADJUSTING EMERGENCY ESCAPE METHOD WHEN POWER TRAIN HAS TROUBLE 4) Install elbow H3 and connect end hose [7] of pump assembly H2 . 5) Turn the starting switch ON and set the park- ing brake lever in the FREE position. 6) Operate the vacuum pump to raise the brake releasing oil pressure to the initial pressure. Initial pressure: Approx. 2.74MPa {28kg/cm 2 } a Since an accumulator is installed in the circuit, the handle must be operated 30 – 50 times to raise the oil pressure. a If the oil pressure does not rise above a certain level, the relief valve may be set to low pressure. In this case, adjust the set pressure of the relief valve. 7) Tow the machine to a safe place.
a The brake releasing oil pressure lowers gradually because of internal leakage and the brake is applied again about 1 minutes after. Accordingly, work quickly. a If the brake releasing pressure lowers to about 1.5MPa {16kg/cm 2 }, the brake is applied. In this case, operate the volume pump again to raise the brake releasing pressure to the intial pressure. 8) When disconnecting the hose after finishing the work, loosen the screw slowly and do not stand in the spouting direction of the oil. D85EX-15 20-141 (1)