Komatsu — ASSEMBLY

DISASSEMBLY AND ASSEMBLY PTO 5. Scavenging pump drive gear 1) Remove snap ring (21). 2) Drive out gear (22) from the snap ring side. ASSEMBLY a Clean the all parts and check them for dirt or damage before installing. a Drop engine oil onto the rotating parts of each bearing and rotate it several turns. a Check that the snap rings are fitted in the grooves. 1. Outer race of input shaft bearing 1) Install snap ring (24) to the PTO and torque converter case. 2) Press fit outer race (25). a Do not press the snap ring with an exces- sive force. 3) Remove snap ring (36) and bearing (23). 2. Scavenging pump drive gear 1) Install bearing (23) to the case. 2) Install snap ring (36). 6.

Outer race of input shaft bearing Remove snap ring (24), and then remove outer race (25) from the PTO and torque converter case. 30-96 D85EX-15 (2)