Komatsu — INSTALLATION

DISASSEMBLY AND ASSEMBLY TRACK FRAME INSTALLATION Carry out installation in the reverse order to removal. [*1] [*2] [*3] [*4] 3 Mounting bolt: 54 – 123 Nm {5.5 – 12.5 kgm} Refilling with oil Add oil through the oil filler at the upper section. a The oil level must be 20 mm from the top of the pivot shaft. 5 Pivot shaft case: Approx. 8 l 3 Oil filler plug: 127 – 176 Nm {13 – 18 kgm} 30-126 D85EX-15 (2)