Komatsu — ASSEMBLY

DISASSEMBLY AND ASSEMBLY CARRIER ROLLER 10. Using tool N1 , install floating seal (13) to ring (12). a Clean and degrease the O-ring and O-ring fitting surfaces thoroughly and dry them before installing. a After installing the floating seal, check that its slant is less than 1 mm. 12. Using tool N2 , add oil through the oil filler and tighten the oil filler plug. 5 Carrier roller: Approx. 0.47 – 0.53 l 3 Oil filler plug: 157 – 255 Nm {16 – 26 kgm} 11. Using push tool [9], press fit ring (12) to carrier roller assembly (1). Press fitting force for ring: 40 – 73 kN {4.1 – 7.4 tons} a Press fit the ring so that distance b between the shaft end and ring top will be 120 ± 0.2 mm.

a After press fitting the ring, check that its slant from the shaft is less than 0.4 mm. 30-146 D85EX-15 (2)