DISASSEMBLY AND ASSEMBLY TRACK SHOE 7) Adjust the relief pressure of the link press so that the pressing force of the press will not exceed the standard value. a If the pressing force is too strong, the spacer will be pressed forcibly against the bushing. As a result, the spacer may be broken and it and bushing may be worn abnormally. a Final pressing force for pin and bushing: 588 kN {60 tons} Final pressing force C 1.8 x Average press fitting force (Adjust the relief pressure of the link press to set the final pressing force.) 3) Using the shoe bolt hole pitch gauge, press fit the master links until the distance between the shoe bolt holes of both links is the stan- dard value.
a Remove the all steel chips caused by press fitting of the bushing with com- pressed air. 4) Turn over the master links and check that they are press fitted in parallel. 2. Assembly of link 1) Apply oil (GO90) to the mating surfaces of the pin and bushing with a clean brush and assemble them, then set them before the jaw of the link press. a When reusing (reversing) the bushing, set the worn outside surface of the bush- ing on the shoe fitting side of the link (set the bushing with the worn outside sur- face up on the link press). 5) Measure the projections of the bushing on both sides with a depth gauge.
a Adjust the press fitting jig of the link press so that the projections on both sides will be even. 2) Press fit the master links on both bushing sides to the bushing with the shoe fitting faces up. a At this time, use the master links on the pin side as supports. a Press fitting force for bushing: 68 – 108 kN {7 – 8 tons} 6) Send the master links and set the next pin and bushing. a When reusing a pin, install it so that its side hole e will be on the link tread side similarly to a new one. If it is not installed so, its strength may be lowered. Accord- ingly, indicate the direction of the side hole e on the end face to prevent a mis- take. 30-154 D85EX-15 (2)