DISASSEMBLY AND ASSEMBLY TRACK SHOE 11) Set the left jig on the receiving side and the right one on the pushing side and press fit the left link. a When press fitting, take care that both seals and spacers will not come off. a Press fitting force for link: 274 – 363 kN {28 – 37 tons} a If the distance between the shoe bolt holes is shorter than the standard range and the shoe cannot be installed, the spacer or bushing end may be worn more than the allowable limit. In this case, disassemble and replace the parts. 14) After each link is assembled, bleed air from the pin by using tool R7 and check the seal- ing performance.
a Keep the degree of vacuum inside the pin at 91 – 95 kPa {680 – 710 mmHg} for 5 seconds and check that the pressure does not change. If the pressure changes, disassemble and check the seal. If the seal is free from abnormality, assemble again. 12) Press fit until the link, spacer, and bushing are fitted together. a Actually, you cannot see from outside if the above parts are fitted. Accordingly, control the hydraulic pressure of the link press. Set the relief pressure to a proper level and heighten the hydraulic pressure to that level. For setting of the relief pressure, see Preparation work. a Check that adjacent 2 links can turn around each other.
15) Using tool R7 , supply oil (G090) until the oil supply pressure rises to 196 – 294 kPa {2 – 3 kg/cm 2 }. a In a cold or very cold district, supply Komatsu genuine oil (150-19-19270 or 195-32-61990) having better low-temper- ature characteristics instead of G090. a If the oil pressure is heightened too much, it has bad effects on the seal. Take care. 13) Using a shoe bolt hole pitch gauge, measure the distance between the shoe bolt holes and check that the result is within the stan- dard range. a If the distance between the shoe bolt holes is longer than the standard range, disassemble and check for abnormality, then press fit again. 30-156 D85EX-15 (2)