Komatsu — WHOLE ASSEMBLY

DISASSEMBLY AND ASSEMBLY TRACK SHOE 5) Measure the projections of the bushing on both sides with a depth gauge. a Adjust the press fitting jig of the link press so that the projections on both sides will be even. 2) Press fit the master links on both bushing sides to the bushing with the shoe fitting faces up. a At this time, use the master links on the pin side as supports. a Press fitting force for bushing: 68 – 108 kN {7 – 8 tons} 6) Send the master links and set the next pin and bushing. a When reusing a pin, install it so that its side hole will be on the link tread side similarly to a new one. If it is not installed so, its strength may be lowered.

Accord- ingly, indicate the direction of the side hole on the end face to prevent a mis- take. a If the outside of the pin is worn, install it so that the un-worn surface will be on the traction side. In this case, install the pin so that its side hole will be on the link tread side. 3) Using the shoe bolt hole pitch gauge, press fit the master links until the distance between the shoe bolt holes of both links is the stan- dard value. a Remove the all steel chips caused by press fitting of the bushing with com- pressed air. 4) Turn over the master links and check that they are press fitted in parallel.

7) Set both links and operate both pushing jigs to press fit the pin and bushing simulta- neously. a If the pin and bushing have play when they are press fitted, the seal may come off the link. To prevent this, press fit smoothly. If the seal comes off the link, stop press fitting and set the seal to the link correctly, then start press fitting again. 30-160 D85EX-15 (2)