DISASSEMBLY AND ASSEMBLY TRACK SHOE DISASSEMBLY OF 1 LINK IN THE FIELD 6. Apply high pressure to jack R2-7 gradually to disconnect the link. k Only how to use the tools is explained below. For details of disassembly and assembly, see WHOLE DISASSEMBLY (OR ASSEMBLY) OF TRACK SHOE. 1. Using screw R2-4 and nut R2-3 , install frame R2- 1 to the cylinder. 2. Using the screw, install adapter R2-5 to frame R2-1 . 3. Set extension R2-2 and pusher R2-6 . 4. Apply hydraulic pressure to the hydraulic cylin- der to pull out the 2 pins. ASSEMBLY OF 1 LINK IN THE FIELD 1. Assemble the link sub-assembly. 1) Set tool R2-8 on the tread side of the link and press fit bushing (1).
a Press fitting force for bushing: 69 – 108 kN {7 – 11 tons} 5. Install jack R2-7 and spacer [1] of the following size to the tread side of the link. a If an electric pump is used, unnecessarily high hydraulic pressure may be applied. Accordingly, be sure use a hand pump. Size of spacer: Outside diameter 55 mm x Thickness 51 mm 2) Set tool R2-9 to the end of link (on the pin side) and press fit pin (2). a Set the pin with its side hole a directed toward tread b of the link. a Pressing force for ping: 206 – 255 kN {21 – 26 tons} 30-164 D85EX-15 (2)