Komatsu — DISASSEMBLY AND ASSEMBLY OF MASTER LINK

DISASSEMBLY AND ASSEMBLY TRACK SHOE 4) Remove adapter R2-5 and set adapter R2-11 in the large hole. 5) Set pusher R2-12 to extension R2-2 . 6) Apply the specified final pressing force to the 2 link connecting parts to install. 2) Removal of master link on pin side Cut the parts marked V V V with gas and remove the hatched parts. Remove pin (13) from link (14) by pressing it with a press in the direction of white arrow, and then remove pin (13) and link (15) from bushing (16) simultaneously. Special tool: Gas cutting machine : Tool R DISASSEMBLY OF MASTER LINK 1. Removal of track shoe assembly Remove the track shoe assembly from the chas- sis. ASSEMBLY OF MASTER LINK 2.

Removal of master link 1) Cutting and removal of master link on bush- ing side with gas Cut the parts marked V V V with gas and remove the hatched parts. Pull out master links (8) and (9) by moving them in the direc- tions of white arrow. Furthermore, remove pins (11) and (12) from regular link (10) by pressing them with a press in the directions of black arrow. Special tool: Gas cutting machine : Tool R 1. Assembly of link on bushing side 1) Press fit master link (1) on the bushing side to bushing (2) with a press. a Press fit both master links in parallel. a Do not damage the mating faces of the master links and end of the bushing. Unit:

mm L1 146 L2 182.8 D1 25 drill D2 22 x 2.0 30-166 D85EX-15 (2)