SEN00680-01 30 Testing and adjusting Emergency operation method when work equipment has trouble 1 3. Disconnect connector WLK of the work equip- ment lock solenoid valve and connect it to the male side of wiring harness T . a Tools for emergency operation T 17A-06-41421 Wiring harness a If the blade or ripper cannot be moved be- cause of a trouble in the work equipment con- trol system, operate it according to the following procedure. a The engine must be startable for the following procedure. k Do not turn the starting switch ON or start the engine before preparing wiring harness T completely. a Connector on machine side to be con- nected 1.
Install wiring harness T in the operator's cab and check where to connect each connector. q WLK : To work equipment lock solenoid under floor Connector on machine side Connector on wiring harness T side q WEPW : To power supply connector above control valve WLK (male) WLK 4. Remove the control valve cover. q WEPX : To EPC solenoid above control valve 4 Control valve cover: 25 kg q WEPY : To EPC solenoid above control valve 5. Remove the plug of power supply connector WEPW above the control valve and connect connector WEPW of wiring harness T to the female side. 2. Remove the floor cover from the front of the operator's seat. 4 Floor cover:
20 kg a Connector to be connected Connector on machine side Connector on wiring harness T side WEPW (female) WEPW 28 D155AX-6 Symbol Part No. Part name