DIAGNOSTIC TESTS ICP System Function Test • The Injection Control Pressure system must be able to build a minimum of 500 psi for the engine to start. During cranking, the ECM must command the IPR valve partially closed to create the pressure required for starting. Test this function by replacing the ECM signal with a direct connection between the IPR and battery power and ground. IPR HEAT SHIELD Disconnect the IPR from the engine harness. Install the Actuator Breakout Harness (ZTSE4484) to the IPR only. Use jumper wires to provide power to one lead and a ground to the other. Crank the engine while measuring the injection control pressure.
If the engine starts or the pressure now exceeds the minimum cranking pressure, the ECM is not controlling the IPR. ACTUATOR BREAKOUT HARNESS Caution: Do not leave the IPR powered for more than 120 seconds or the IPR may be damaged. IPR Function Test • The IPR must function for the ICP system to build sufficient pressure to start. Remove the ICP sensor from the right bank valve cover. Install the ICP System Test Adapter (ZTSE4594) with an air fitting in place of the sensor. Remove the oil fill cap and attach shop air pressure to the air fitting. SHOP AIR SUPPLY SHOP AIR SUPPLY Listen at the opening of the oil fill cap for air leaking into the crankcase from the IPR.
Allow five minutes for the air to displace the oil through the system (cold oil may take longer). If there is a massive air leak in the crankcase when the air is connected, go to the Under Valve Cover Leak test. If there is a faint leak, install the Actuator Breakout Harness (ZTSE4484) to the IPR only. Provide power to one breakout harness lead and a ground to the other. The faint air leak in the crankcase should stop when power is applied. This verifies the ECM signal can operate the IPR valve internally. If the faint air leak stops when the IPR is given power and ground, perform the pump test. ICP TEST ADAPTER ICP TEST ADAPTER RIGHT BANK VALVE COVER 97 International ® VT 275 V6 Engine