John Deere 326D, 328D, 332D — Key Switch ON, Engine ON Checks

Miscellaneous—Operational Checkout 9 Boom Up Drift Check NOTE: This check may require two people. Close cab door—if equipped. NOTE: Machine must be equipped with a bucket for this check. Operate hydraulic system until hydraulic oil reaches temperature specification. Specification Hydraulic Oil—Temperature..................................................................................... 43°C 110°F NOTE: Bucket may need to be in dump position. Actuate boom down function to raise front of machine off the ground. Engage park brake. Mark and record a distance on the boom cylinder rod from the cylinder barrel. Disengage park brake.

Allow machine to sit with engine speed at slow idle for 5 minutes. Engage park brake. Measure marked distance on boom cylinder rod. Specification Boom Circuit—Drift (maximum).............................................................. 12.7 mm/5 min. 0.5 in./5 min. NO: Go to next step in this check. LOOK: Does boom drift up more than specification? YES: Go to next check. Actuate boom down function to raise front of machine off the ground. Engage park brake. Turn engine off. Allow machine to sit for 5 minutes. Specification Boom Cylinder—Drift (maximum)........................................................... 12.7 mm/5 min. 0.5 in./5 min. YES: See your authorized dealer. LOOK:

Does boom drift up more than specification? NO: Go to next check. Continued on next page OUT4001,000051E -19-04DEC09-20/28 4-2-6 071713 PN=151